1 Scope
This document provides guidelines for measurements of the maximum power (Pmax) output of single-junction photovoltaic (PV) modules and for reporting at standard
test conditions (STC) in industrial production line settings. Such measurements typically:
-
• Record current-voltage (I-V) data while illuminating the module with a solar simulator;
-
• Are performed on 100 % of manufactured modules, in order to determine whether they meet nameplate requirements for various bins spanning different power output levels.
This type of measurement is widespread and performed in high volume by PV module manufacturers
worldwide. As it is desirable to have consistent measurement practices across the
industry, this document describes the following features of such measurements:
-
• Essential elements, in order to provide common understanding;
-
• Common issues or complications;
-
• Sources of error and uncertainty, including recommendations to minimize them.
Understanding of Pmax measurement uncertainties is expected to be useful in application of other IEC documents,
such as IEC 61215‑1 and IEC 62941, where Pmax tolerances and uncertainties must be determined. Whenever possible, this document
references specific IEC documents covering topics in more detail. Where no such documents
exist, this document provides guidance and recommendations based on other publications
relevant to the PV industry.