1 Scope
This part of IEC 60287 provides a method for calculating the phase currents and circulating current losses in single-core cables arranged in parallel.
The method described in this document can be used for any number of cables per phase in parallel in any physical layout. The phase currents can be calculated for any arrangement of sheath bonding. For the calculation of sheath losses, it is assumed that the sheaths are bonded at both ends. A method for calculating sheath eddy current losses in two circuits in flat formation is given in IEC 60287‑1‑2.
A Commented Version (CMV) of this standard is available here. Please note, the CMV of the standard is not adopted, and therefore doesn’t contain an additional national foreword, or national annex that might be contained in the BS adoption of the standard. However the IEC text that forms the content of the standard is identical to the BS adoption of the standard.
Commented Versions (CMVs) are specialized publications featuring detailed commentary from technical experts on the major changes between the new edition of a standard and the previous one. Comments may include an explanation for the changes as well as information on the impact of these changes on the application and usability of the standard.